Lift Lobby and Entrance Interior Design in Dhaka
The ground floor lobby and the lift landing on each floor are the first and last things residents and visitors see every day. In many Dhaka buildings they are left plain or worn. Charuta Plus designs lift lobbies and entrances that look premium and stand up to heavy use.
Call 01711-428372 or book a free design consultation and our designer will visit your space to discuss your lobby.
What is lift lobby interior design?
Lift lobby interior design is the planning of the space in front of the lifts and the main building entrance, including wall cladding around lift doors, floor finish, ceiling and lighting, signage, seating, mailboxes and security desk. It sets the image of the whole building for residents, tenants and guests.
Key takeaways
- Lift lobby design covers lift front walls, floors, ceiling, lighting, signage, seating and security or reception desk.
- Hard-wearing finishes such as porcelain tiles, granite and stone-look panels last longest in high-traffic lobbies.
- Each floor's lift landing can share one design language so the building feels consistent.
- A ground floor lobby typically takes about 3 to 6 weeks after design approval.
- The main benefit is a stronger building image that adds value for owners, tenants and buyers.
What does a lobby project include?
- Lift front wall cladding in stone, porcelain slabs, stone-look sheets, metal or wood panels.
- Floor in granite, porcelain or terrazzo with a pattern at the entrance.
- Gypsum ceiling with cove light and downlights.
- Building name signage, floor numbers and directory board.
- Guard or reception desk, mailboxes and waiting seating.
- Typical floor landing design repeated on every level.
What problems do Dhaka building lobbies face?
- Heavy wear: scratched walls and stained floors. Durable, easy-clean finishes solve this.
- Dark corridors: layered lighting improves safety and looks.
- Rain and mud: anti-skid entrance tiles and a mat well keep floors safe in monsoon.
- Messy services: panels hide meters, pipes and wiring.
Who do we design lobbies for?
Apartment owners associations and developers, office building owners and companies that want their floor's lift landing to match their office reception. Lobby work can be combined with feature wall design across the building.
How does a lobby project work?
- Survey. Measure the lobby and each floor landing and check services.
- Design. 3D design for the ground lobby and a typical floor.
- Approval. Material samples for the committee or owner.
- Execution. Work in phases so lifts and entrances stay in use.
Why choose Charuta Plus for your building lobby?
- Working in Bangladesh since 2010, with 600+ completed interior projects across homes, offices and commercial spaces.
- One team handles design, 3D visuals, factory work and on-site installation, so you deal with one point of contact.
- Head office in Banani (House 30, Road 20, Block K, Dhaka 1213), with project engineers who supervise work on site.
- Support after handover: if a hinge, channel or light fitting needs adjusting, you call the same team.
See more of our work in the portfolio.
Related interior design services
Frequently asked questions
Which material is best for a lift front wall?
Granite, porcelain slabs or stone-look sheets for durability, with metal or wood accents for a premium look.
Can the lobby stay open during work?
Yes. We work in phases and keep a safe path to the lifts at all times.
How long does a lobby take?
A ground floor lobby usually takes about 3 to 6 weeks after design approval.
Can you design every floor landing?
Yes. We create one design for a typical floor and repeat it for consistency.
Who approves the design in an apartment building?
Usually the owners association or committee. We provide 3D views and samples to help them decide.
Give your building a better first impression
Share photos of your lobby and we will suggest a design. Call 01711-428372 or send us your floor plan to get started.